Penultimate day

There is very little work to be done and Adrian the plumber is due at midday on Thursday to do the final connections.

The vanity went in upstairs, it is also wall hung but with a shelf under the drawer. I’m very happy with the colour and pattern of the veneer I chose based on a very small chip. It works very well with the floor tiles.

Veneer

Other small items such as the shelf in the shower, and toilet roll holder went in, and the tiles above the basin. There are just four whole white tiles left over.

vanity top

The dominate shapes up here are squares and curves. I love the way the shower door tracks when open.

 

Advertisements

2 responses to “Penultimate day

  1. Great Christmas present to your self. I like your soap/shampoo holder, much better than mine

  2. Lovely to hear from you Kate, I think it covers many Christmases to come.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s