Not quite there yet

Plumbing didn’t happen today as planned, job scheduling was changed at the last moment so I have to wait until tomorrow for this last task to be complete.

Once it is all done I will be able to get to use my sewing room again. It has been under wraps while the work has been going on upstairs because of all the sawdust and bits of plaster falling down from above. The ceiling is the floorboards of the room above.

I’ve also had to move furniture to give access to the plumbing from below. shower drain

 

The shower drain has to be connected to the sewer pipe with a trap, there is only just enough space thanks to the moving of the joist. Once this is done the boards will go back up closing off the bulkhead.

I’m sure the job will be done perfectly so there is no risk of a shower coming down on my fabric.

 

 

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s